INDUSTRIAL VACUUM CLEANER WIELAND MAXVAC ECO 220 WITH INTERCEPT HOPPERS – A CASE STUDY

TO CLEAN THE 6M DEEP PIT BELOW THE CEMENT BLOCK MANUFACTURING MACHINE

PRESENTLY JOB DONE BY: 15 MANPOWERS WORKED FOR 14 HOURS TO LIFT THE MATERIALS WITH PRODUCTION HALTED. THE COLLECTED WASTE IN BUCKETS WERE LIFTED BY FORKLIFT.

PROBLEM FACED: STOPPED PRODUCTION WHILE CLEANING , INCREASED MANPOWER, HUGE OUTSIDE TEMPERATURE POSED MANY HEALTH HAZARDS

SOLUTION: 20 KW MACHINE WITH ENOUGH SUCTION POWER USING THE SPECIALISED HEAVY DEVICE SUCTION TOOLS. MANPOWER REQUIRED: 2 NOS. TO PLACE THE SUCTION HOSE IN THE PIT. CLEANING TIME DRASTICALLY REDUCED FROM 14 TO 2 HOURS AND THE WASTE IS COLLECTED INTO THE 1000 LITRES INTERCEPT HOPPERS WITH FORKLIFT ATTACHMENT

CONCLUSION: CLIENT IS EXTREMELY HAPPY WITH THE INCREASE IN PRODUCTION TIME AND ALSO SAVING THE MANPOWER.